| 1. |
Ranu and Bhanu can separately do a piece of work in 18 days and 12 days respectively. They worked together for 6 days, after which Bhanu was replaced by Shivam. If the work was finished in next 2 days, then what is the number of days in which Shivam alone can do the work? |
| A. | 28 days |
| B. | 36 days |
| C. | 20 days |
| D. | 24 days |
| E. | None of these |
| Answer» C. 20 days | |