MCQOPTIONS
Saved Bookmarks
| 1. |
Quality control helps to ___________ the risks of overdesign that ___________ the overall cost. |
| A. | Maximize, Increase |
| B. | Minimize, Increase |
| C. | Maximize, Decrease |
| D. | Minimize, Decrease |
| Answer» E. | |