Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot in Statistical Quality Control
→
Process standard deviation is necessarily equal to..
1.
Process standard deviation is necessarily equal to the sample standard deviation of the same process.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
<p>15. There is no need of revision of control limits once calculated by the equations of control limits.
Process standard deviation is necessarily equal to the sample standard deviation of the same process.
What type of chart will be used to plot the number of defectives in the output of any process?
The natural variability of the process is measured by ____________
Control limits are ___________
Is there any relationship between specification limits and control limits of and R charts?
A tolerance diagram is also called ____________
For any process, the sample ranges are, 1.2,1.5,1.1,1.4,1.5. The subgroup size is 5. What will be the process standard deviation? Given: d<sub>2</sub>=2.326 and A<sub>2</sub>=0.577
The process standard deviation is given by __________
Process capability generally uses __________