MCQOPTIONS
Saved Bookmarks
| 1. |
Prime cost may be correctly defined as |
| A. | the sum of direct materials and direct labour cost with all other costs excluded |
| B. | the total of all cost item |
| C. | the total cost incurred in producing a finished unit |
| D. | none of the above |
| Answer» B. the total of all cost item | |