Portion of an embankment having a uniform up gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2: 1, the earthwork involved |
A. | 26,000 m3 |
B. | 26,500 m3 |
C. | 27,000 m3 |
D. | 27,500 m3 |
Answer» E. | |