MCQOPTIONS
Saved Bookmarks
| 1. |
Pneumatic caissons are closed at _________ during construction. |
| A. | Bottom |
| B. | Top |
| C. | Top and bottom |
| D. | None of the mentioned |
| Answer» C. Top and bottom | |