

MCQOPTIONS
Saved Bookmarks
1. |
P.M.T.S. (Predetermined Motion Time Systems) include |
A. | M.T.M. (Method Time Measurement) |
B. | W.F.S. (Work Factor Systems) |
C. | B.M.T.S. (Basic Motion Time Study) |
D. | all of these |
Answer» E. | |