1.

P.M.T.S. (Predetermined Motion Time Systems) include

A. M.T.M. (Method Time Measurement)
B. W.F.S. (Work Factor Systems)
C. B.M.T.S. (Basic Motion Time Study)
D. all of these
Answer» E.


Discussion

No Comment Found