MCQOPTIONS
Saved Bookmarks
| 1. |
Plastic wastes are used for the construction of………… |
| A. | beams and columns |
| B. | floor slab |
| C. | bituminous road |
| D. | none of the above |
| Answer» D. none of the above | |