MCQOPTIONS
Saved Bookmarks
| 1. |
Plants with maximum operating costs are put on load for : |
| A. | Maximum time |
| B. | During peak load |
| C. | Emergency conditions |
| D. | During Medium loads |
| Answer» D. During Medium loads | |