

MCQOPTIONS
Saved Bookmarks
1. |
Plants with maximum operating costs are put on load for : |
A. | Maximum time |
B. | During peak load |
C. | Emergency conditions |
D. | During Medium loads |
Answer» D. During Medium loads | |