MCQOPTIONS
Saved Bookmarks
| 1. |
Plants with higher operating cost and greater flexibility are suitable for? |
| A. | Only Base load |
| B. | Only Peak load |
| C. | Base and Peak loads |
| D. | Plants with higher operating cost are not used |
| Answer» C. Base and Peak loads | |