To design a cross-over between parallel tracks, the required components are : |
A. | two switch, points, two acute angle crossings and two check rails |
B. | two switch points, two acute angle crossings and four check rails |
C. | two switch points, two acute angle crossings and six check rails |
D. | none of these. |
Answer» C. two switch points, two acute angle crossings and six check rails | |