In a network shown in the below figure, the critical path is along |
A. | 1-2-3-4-8-9 |
B. | 1-2-3-5-6-7-8-9 |
C. | 1-2-3-4-7-8-9 |
D. | 1-2-5-6-7-8-9 |
Answer» C. 1-2-3-4-7-8-9 | |