1.

If l is the effective span in metres and D is overall depth of the section in mm, the structure may be accepted after 24 hour load test, provided the maximum deflection in mm is less than

A. <img src="/_files/images/civil-engineering/structural-design-specifications/01-22-39-1.png">
B. <img src="/_files/images/civil-engineering/structural-design-specifications/01-22-39-2.png">
C. <img src="/_files/images/civil-engineering/structural-design-specifications/01-22-39-3.png">
D. <img src="/_files/images/civil-engineering/structural-design-specifications/01-22-39-4.png">
Answer» E.


Discussion

No Comment Found