1.

For transferring the tunnel alignment through shafts, we adopt the following steps :
1. Hanging two or more plumb lines in the shaft
2. Determining the bearing of the plumb lines i.e. plumb plane
3. Suspending a 35 kg weight by each plumb line
4. Immersing the weights of both the plumb lines in the buckets containing water.
The correct sequence of steps is :

A. 1 2 3 4
B. 4 3 2 1
C. l 3 2 4
D. 2 1 4 3
Answer» B. 4 3 2 1