MCQOPTIONS
Saved Bookmarks
| 1. |
Match List-I with List-II and select the correct answer using the codes given below the lists: List-I(A function connected with NC m/c tool) List-II (Associate parameter) A. interpolation 1. Tape preparation B. Parity check 2. Canned cycle C. Preparatory function 3. Drilling D. Point-to-point 4. Controlling 5. Turning Codes: |
| A. | A\[\to \]4, B\[\to \]1, C\[\to \]2, D\[\to \]3 |
| B. | A\[\to \]4, B\[\to \]1, C\[\to \]2, D\[\to \]5 |
| C. | A\[\to \]5, B\[\to \]1, C\[\to \]3, D\[\to \]2 |
| D. | A\[\to \]1, B\[\to \]4, C\[\to \]3, D\[\to \]2 |
| Answer» B. A\[\to \]4, B\[\to \]1, C\[\to \]2, D\[\to \]5 | |