Match List-I with List-II and select the correct answer using the code given below the lists: List-I (Technique) List-II (Suitable for) A. Time study 1. Short-cycle nonrepetitive jobs B. Work sampling 2. Manual operations C. Analytical estimation 3. Short-cycle repetitive jobs D. MTM 4. Long-cycle jobs/ heterogeneous operations/operations involving team work Codes: |
| A. | A\[\to \]2, B\[\to \]4, C\[\to \]1, D\[\to \]3 |
| B. | A\[\to \]3, B\[\to \]1, C\[\to \]4, D\[\to \]2 |
| C. | A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3 |
| D. | A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2 |
| Answer» E. | |