Match List-I (Files in MRP) with List-II (Inputs required) and select the correct answer using the codes given below the lists: List-I (Files in MRP) List-II (Inputs required) A. Master Production Schedule 1. Scheduled Receipts B. Bills of Materials 2. Unit Costs and Discounts C. Inventory Records 3. Production Capacity D. 4. Product Structure Codes: |
| A. | A\[\to \]4, B\[\to \]1, C\[\to \]3 |
| B. | A\[\to \]3, B\[\to \]4, C\[\to \]2 |
| C. | A\[\to \]3, B\[\to \]4, C\[\to \]1 |
| D. | A\[\to \]4, B\[\to \]3, C\[\to \]1 |
| Answer» D. A\[\to \]4, B\[\to \]3, C\[\to \]1 | |