MCQOPTIONS
Saved Bookmarks
| 1. |
Make up water is required in a cooling tower to replace the water lost by |
| A. | evaporation |
| B. | drift |
| C. | blowdown and leakage |
| D. | all (a), (b) and (c) |
| Answer» E. | |