

MCQOPTIONS
Saved Bookmarks
1. |
Make up water is required in a cooling tower to replace the water lost by |
A. | evaporation |
B. | drift |
C. | blowdown and leakage |
D. | all (a), (b) and (c) |
Answer» E. | |