

MCQOPTIONS
Saved Bookmarks
1. |
__________ maintained in the SNP PPM or Transportation Lane determines the Availability Date of a Receipt element within a time bucket (period). |
A. | Master Factor |
B. | Time Factor |
C. | Period Factor |
D. | Both B and C |
Answer» D. Both B and C | |