

MCQOPTIONS
Saved Bookmarks
1. |
____________ is necessary to tie back the scaffolding with the building at suitable levels. |
A. | Loading |
B. | Tying-in |
C. | Raising |
D. | Spacing |
Answer» C. Raising | |