

MCQOPTIONS
Saved Bookmarks
1. |
In which of the following methods, the output sequence is considered as shown in the below diagram? |
A. | Overlap save method |
B. | Overlap add method |
C. | Overlap add & save method |
D. | None of the mentioned |
Answer» C. | |