MCQOPTIONS
Saved Bookmarks
| 1. |
In which method a refrigeration plant of required capacity is need to be installed near the site of work. |
| A. | Pumping |
| B. | Well Point System |
| C. | Freezing process |
| D. | Electro osmosis process |
| Answer» D. Electro osmosis process | |