MCQOPTIONS
Saved Bookmarks
| 1. |
In the spiral model risk analysis is performed |
| A. | in the first loop |
| B. | in the first and second loop |
| C. | in every loop |
| D. | before using spiral model |
| Answer» D. before using spiral model | |