MCQOPTIONS
Saved Bookmarks
| 1. |
In system engineering which of the following methods bridges the gap between the two ends of system development? |
| A. | ASM method |
| B. | VSM method |
| C. | Factor method |
| D. | FSM method |
| Answer» B. VSM method | |