MCQOPTIONS
Bookmark
Saved Bookmarks
→
Civil Engineering Drawing
→
Analysis of Rate of Road Work in Civil Engineering Drawing
→
In ideal pavement is constructed with _________..
1.
In ideal pavement is constructed with _________
A.
bricks
B.
hard soil
C.
portland cement concrete
D.
tar
Answer» D. tar
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The head of public works department of any Indian state, is ____________
In ideal pavement is constructed with _________
An Executive Engineer of roads, executes works under direct control of _________
Enoscope is used to determine ___________
The absolute minimum sight distance required for stopping a vehicle moving with a speed of 80 km ph, is ____________
Driving vehicles on wet surfaced roads, is dangerous because it may ___________
Reinforcement in cement concrete slab of road pavements, is placed ____________
The length of the side of warning sign boards of roads is ___________
Volume of traffic which would immediately use a new road or an improved one when opened to traffic is known as ___________
The weight of vehicles affects ____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply