MCQOPTIONS
Saved Bookmarks
| 1. |
In case of laying gullies, siphons, intercepting traps, the cost includes |
| A. | Setting and laying |
| B. | Bed concreting |
| C. | Connection to drains |
| D. | All of these. |
| Answer» E. | |