In a studio, the noise level should be brought down to ___________
A.
5-10 dB
B.
10-15 dB
C.
20-30 dB
D.
50-60 dB
Answer» D. 50-60 dB
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The 3 sigma limits on x bar control charts imply that the type I error probability is __________
Never attempt to interpret the x chart when the R chart indicates the out of control condition.
Stratification of points on a control chart indicates __________ of natural variability of the process.
Stratification is defined as ________
Shift in process level can be seen on the control charts when __________
Which of these is a cause of trend patterns on a control chart?
Which chart should be interpreted first when both, x chart, and R chart are indicating a non-random behavior?
The control limits obtained by specifying the type I error level for the test, are called ________
When using standard values of process mean and standard deviation, the equation of UCL for a x chart is given as, UCL = μ+AσWhat is the value of A here?
Unlike x chart, which measures between-sample variability only, an R chart is used to monitor ____
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies