

MCQOPTIONS
Saved Bookmarks
1. |
in a process costing system, manufacturing overhead is assigned to work in process by |
A. | Department based on actual overhead costs incurred |
B. | Department based on predetermined overhead rates |
C. | Job based on actual overhead costs incurred |
D. | Job based on predetermined overhead rates |
Answer» C. Job based on actual overhead costs incurred | |