

MCQOPTIONS
Saved Bookmarks
1. |
In a Canal Syphon type Cross Drainage Work |
A. | canal bed is below the drain |
B. | canal bed is above the drain |
C. | canal bed and the drain at the same level |
D. | canal and the drain crossing at right angles |
Answer» B. canal bed is above the drain | |