MCQOPTIONS
Bookmark
Saved Bookmarks
→
Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot in Statistical Quality Control
→
If the C
pk
=0.9899, the usage of modifie..
1.
If the C
pk
=0.9899, the usage of modified control charts is very necessary.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
If the C<sub>pk</sub>=0.9899, the usage of modified control charts is very necessary.
The six-sigma approach when implemented for a long time, the process may need modified control charts.
Which of these does not say that the modified control limits must be applied?
Which of these is a method used when the process capability is quite high?
Which of these is not a name of Modified control limits for x charts?
Which of these is used when the process has achieved high capability level?
Which of these is not a purpose for which control charts are produced for?
Which method was suggested by Del Castillo and Montgomery, to be used instead of the Q-chart to get better ARL performance?
Which of these charts can be used instead of Shewhart control charts, in the case of small number of subgroups used to construct the charts, which were recommended by Quesenberry?
Who was the first person to study the effect of the number of subgroups used for x bar and R chart control limit calculation on the false alarm rate?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply