1.

How the flow velocity is calculated in the context of gravel packing?

A. Production rate ft<sup>3</sup>/sec / 50% of the open area of slots 50%
B. Production rate ft<sup>3</sup>/sec / 100% of the open area of slots 50%
C. Production rate ft<sup>3</sup>/sec / 60% of the open area of slots 50%
D. Production rate ft<sup>3</sup>/sec / 80% of the open area of slots 50%
Answer» B. Production rate ft<sup>3</sup>/sec / 100% of the open area of slots 50%


Discussion

No Comment Found