MCQOPTIONS
Bookmark
Saved Bookmarks
→
Energy Engineering
→
Principle Stoker in Energy Engineering
→
How much time period is fly ash stone powder cemen..
1.
How much time period is fly ash stone powder cement bricks water cured?
A.
A week
B.
2 weeks
C.
3 weeks
D.
1 month
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which type of concrete is useful in high rise construction?
Which among the following when utilized gives good finishing on the both sides of the walls?
How much amount of fly ash is made utilized by India?
How much time period is fly ash stone powder cement bricks water cured?
Sintered light weight aggregates are produced by which method?
How much percent of fly ash is, mixed with Portland cement?
What is the India s current total capacity of power plants installed?
Why is used for treating acidic soils?
Ash is widely used in the production of _______
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply