MCQOPTIONS
Saved Bookmarks
1. |
High pressure grouting is generally restored for concreting in the lining if the rock strata is: |
A. | highly fissured |
B. | poor |
C. | likely to get seepage of water |
D. | All of the above. |
Answer» E. | |