

MCQOPTIONS
Saved Bookmarks
1. |
For highways, tunnelling is preferred to if the open cut exceeds : |
A. | 10 metres depth |
B. | 15 metres depth |
C. | 20 metres depth |
D. | 25 metres depth. |
Answer» C. 20 metres depth | |