For bullheading a well, the required bullhead volume and strokes calculations used are ___ |
A. | From surface to the bottom perforations |
B. | From surface to the top perforations |
C. | Surface to side pocket mandrel |
D. | Packer to perforation |
Answer» B. From surface to the top perforations | |