MCQOPTIONS
Saved Bookmarks
| 1. |
For bullheading a well, the required bullhead volume and strokes calculations used are ___ |
| A. | From surface to the bottom perforations |
| B. | From surface to the top perforations |
| C. | Surface to side pocket mandrel |
| D. | Packer to perforation |
| Answer» B. From surface to the top perforations | |