1.

For a manual operation observed time data are given below: Recorded time                : 15 minute Rating of the worker           : 80% Personal allowance            : 0.6 minute Basic fatigue allowance        : 0.8 minute Contingency work allowance    : 12 minute Unavoidable delay allowance   : 11 minute What is the standard time for the operation?

A. 16.4 minute                  
B. 175 minute
C. 185 minute                   
D. none of the above
Answer» E.