MCQOPTIONS
Saved Bookmarks
1. |
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is |
A. | 0.90 m³ |
B. | 0.94 m³ |
C. | 0.98 m³ |
D. | 1.00 m³ |
Answer» C. 0.98 m³ | |