| 1. |
Examine the following pairs:Plant/Project LocationA. Ukai hydroelectric project1. RajasthanB. Koyali Oil refinery2. GujaratC. Sidrapong Hydroelectric Power Station3. Tamil NaduChoose the INCORRECT pairs: |
| A. | A and B only |
| B. | A and C only |
| C. | B and C only |
| D. | A, B and C |
| Answer» C. B and C only | |