MCQOPTIONS
Saved Bookmarks
| 1. |
During survey work while ranging a line, the signal given by the surveyor is rapid sweep with right hand. The action has to be done by assistant is: |
| A. | Move slowly to the left |
| B. | Move slowly to the right |
| C. | Move considerably to left |
| D. | Move considerably to right |
| Answer» E. | |