1.

During survey work while ranging a line, the signal given by the surveyor is rapid sweep with right hand. The action has to be done by assistant is:

A. Move slowly to the left
B. Move slowly to the right
C. Move considerably to left
D. Move considerably to right
Answer» E.


Discussion

No Comment Found