During survey work while ranging a line, the signal given by the surveyor is rapid sweep with right hand. The action has to be done by assistant is: |
A. | Move slowly to the left |
B. | Move slowly to the right |
C. | Move considerably to left |
D. | Move considerably to right |
Answer» E. | |