1.
Control charts can be used very effectively in the process of hypothesis testing.
A.
True
B.
False
Answer» B. False
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
IF_A_PROCESS_HAS_ITS_OPERATION_WITH________CAUSES_OF_VARIATION,_IT_IS_SAID_TO_BE_AN_OUT-OF-CONTROL_PROCESS.?$
The chance and assignable cause terminology was developed by ____$
Chance_causes_of_variation_are_also_called______and_assignable_causes_are_also_called_____$
Type I error is described as the situation of conclusion of process state as out-of-control when it is in-control.
Control charts can be used very effectively in the process of hypothesis testing.
OC_curve_can_be_used_to_determine_the_probability_of_____
Which of these is not a part of SPC’s 7 tools?#
A process is said to be in the statistical control if it operates with ______ of variation.
Shifting of mean from the current value to a new value and remaining there, is called _____ shift of the mean.
If for a process, 18 out of 20 points are plotted above the CL but below the upper control limit, and only 2 of 20 are plotted between the center line and the lower control limit, what can we say about the process state?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply