MCQOPTIONS
Saved Bookmarks
| 1. |
Contour trenching is performed to |
| A. | Control the landslide from the hill face |
| B. | Conserve the moisture |
| C. | Both (a) & (b) |
| D. | None of these |
| Answer» C. Both (a) & (b) | |