1.

Consider the following steps: 1. Method time measurement 2. Work sampling 3. Work factor system. PMTS (predetermined motion time systems) in work study would include:

A. 1, 2 and 3
B. 1, 3 and 4
C. 1, 2 and 4
D. 1, 2 and 3
Answer» E.