Consider the following operations and time required on a multi-spindle automatic machine to produce a J particular job: 1. Turning - 1.2 minutes 2. Drilling - 1.6 minutes 3. Forming - 0.2 minute 4. Parting - 0.6 minute The time required to make one piece (cycle time) will be: |
| A. | 0.6 minute |
| B. | 1.6 minutes |
| C. | 3.6 minutes |
| D. | 0.9 minute |
| Answer» D. 0.9 minute | |