MCQOPTIONS
Saved Bookmarks
| 1. |
Consider the following: 1. Safety valve 2. Fusible plug 3. Feed water pump 4. Pressure gauge The essential boiler mountings would include. |
| A. | 1, 3 and 4 |
| B. | 3 and 4 |
| C. | 1, 2 and 3 |
| D. | 1, 2 and 4 |
| Answer» E. | |