

MCQOPTIONS
Saved Bookmarks
1. |
Bed bars in a canal are provided |
A. | to watch the general behaviour of canal |
B. | to measure the discharge |
C. | to raise the supply level |
D. | to control the silting |
Answer» B. to measure the discharge | |