MCQOPTIONS
Saved Bookmarks
| 1. |
Based on the given graph figure, the economic range of batch sizes to be preferred for general purpose machine (GP). NC machine (NC) and special purpose (SP) will be: Codes: |
| A. | GP\[\to \]2, NC\[\to \]5, SP\[\to \]4 |
| B. | GP\[\to \]1, NC\[\to \]4, SP\[\to \]5 |
| C. | GP\[\to \]3, NC\[\to \]2, SP\[\to \]4 |
| D. | GP\[\to \]1, NC\[\to \]4, SP\[\to \]2 |
| Answer» C. GP\[\to \]3, NC\[\to \]2, SP\[\to \]4 | |